Case Studies
Rehabilitation of RE Wall Using Soil Nailing
Project: ROB-5 Retaining Wall Repair Client: West Central Railway Location: Itarsi, Madhya Pradesh Contractor: Savinaya Infratech Pvt. Ltd. Design Vetting Authority: IIT Bombay 1. Project Background The Reinforced Earth (RE) wall at ROB-5, Itarsi, constructed in 2022, exhibited significant distress within three years. Issues included panel bulging near the abutment,
Strengthening constructed R S Wall for Height Increase Beyond Original Design
Solution : SDR Nailing + Cementitious Grouting Project : : Six-laning of Varanasi – Aurangabad section of NH-2 from Km 786.000 to Km 978.000 (Length 192.400 Km) in the state of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis under NHDP Phase-V Background : India’s National

Odex Micropiling & Geotechnical Case Study for Railway Expansion at Jindal Paradip Port
Abstract At Jindal Paradip Port, Odisha, a major infrastructure challenge arose during the expansion of railway facilities beneath an existing Road Over Bridge (ROB). The retaining wall was directly supporting the soil of the bridge abutment. If it collapsed, it would have stopped all railway and vehicular movement into the